GATE MT 2020 Q19. In a top gated mold, liquid metal enters the mold cavity as a freely falling stream under gravity from a height of 0.5 m. Ignore the fluid friction due to viscosity and the drag due to change in the direction of flow. If the volume of the mold cavity is 10m^3, then the time required to fill the mold is ________s (round off to nearest integer). Given : 1. Acceleration due to gravity is 9.8 ms^-2 2.Cross – sectional area of gate is 0.2 m^2.
GATE MT 2020 Q19. In a top gated mold, liquid metal enters the mold cavity as a freely falling stream under gravity from a height of 0.5 m. Ignore the fluid friction due to viscosity and the drag due to change in the direction of flow. If the volume of the mold cavity is 10m^3, then the time required to fill the mold is ________s (round off to nearest integer). Given : 1. Acceleration due to gravity is 9.8 ms^-2 2.Cross – sectional area of gate is 0.2 m^2.
Share
For this problem: Find the speed of the flow of liquid using the equation v=sqrt(2gh) Then once velocity is known and you also know the cross sectional area and hence volume flow can be calculated using A1V1 Then Divide the complete volume of mold to this volume flow rate, you will get the answer LiRead more
For this problem:
Link for solution is given in manufacturing section of our channel with link:
https://www.youtube.com/playlist?list=PLFS_xICJ_zVMQAhN_d9-0yWKJW9MY_P9s
See lessCorrect answer is 16 seconds . @Digbijaya igit described it best. Thank you. Some peripheral lines related to this topic:
Correct answer is 16 seconds . digbijaya igit igit described it best. Thank you.
Some peripheral lines related to this topic:

See lessAns=15.971 sec